What if the NRCS is paying for my high tunnel(s)?
If we are installing the high tunnels, there is the option of doing payment assignment through the NRCS. This means you will be signing over your reimbursement for the project
If we are installing the high tunnels, there is the option of doing payment assignment through the NRCS. This means you will be signing over your reimbursement for the project
We generally do not, but if you have no other method of payment, we can make arrangements.
Once an order is confirmed, it typically takes 1-4 weeks to manufacture and deliver your high tunnel(s) if you are within a 250 mile* radius of Berea, KY (*road miles).
When the high tunnel season is active, there might be extended lead times for installation. We recommend that you get your build scheduled up to 16 weeks in the advance.
Yes, we can do partial or full installation of your Grow Appalachia high tunnel if you are within a 100 mile (road miles) proximity of Berea. If you are further
No, but communication is key for site preparation. If you have concerns about your site, please let us know as soon as possible.
No, we highly recommend that you use microirrigation or soaker hoses to maintain good soil moisture. The use of sprinklers in your tunnel will increase humidity levels which can harm
No, but you will need to keep a close eye on the weather as there are fluctuating temperatures in late Spring and early Fall. In these instances, you will need
No, it doesn’t make sense for us to haul or ship lumber, but arrangements can be made if you have challenges sourcing lumber locally.
To date, none of our tunnels have collapsed under slow load and our first tunnels were installed in 2011.